Project Azm: Fifth Gen Fighter Jet Program By Pakistan

Pakistan’s aspiring and visionary Project Azm incorporates the structure and advancement of different imaginative flight ventures, including the improvement of the fifth-age contender flying machine (FGFA), unmanned elevated vehicle (UAV), and different undertakings.

Pakistan Air Force displayed the theoretical plan of its future stealth air ship on the tail of the PAF C-130 at the Royal International Air Tattoo (RIAT) 2019.

Project Azm

The MoDP yearbook stated that the AvRID Secretariat has completed the first cycle of the conceptual design. It stated, “The first cycle of the conceptual design phase has been completed. The first configuration that was designed based on the challenging performance requirements of PAF will go through three more cycles within the conceptual design using higher fidelity analysis tools and codes.”

The Fifth-Generation Fighter Aircraft (FGFA) is the highlight of the much-anticipated Project Azm, which outlines the PAF’s ambition for developing a state of the art aviation industrial base within the country. This aviation industrial complex will support the defense capabilities of the country, alongside fulfilling civilian and commercial aviation needs.

Developing Project Azm Lead By PAF

Project Azm was officially started by the PAF back in July 2017, and its motivation is to build up a FGFA, a medium-height, and long-continuance (MALE), new weapons, unmanned airborne vehicle (UAV), and multiAccording to the MoDP’s 2017-2018 yearbook, the booked cutoff time for the principal trip of the MALE UAV was June 2019. The yearbooks of the MoDP are expected to uncover ventures that are finished during a time of 12-year and a half before the production, which demonstrates that the MALE UAV has either flown or has been postponed, while the FGFA is well into the plan period of the undertaking.

An as of late led meeting with the Pakistan Air Force Chief of Air Staff (CAS), Air Chief Marshal Mujahid Anwar Khan uncovered that he doesn’t expect the fifth era warrior air ship to make its lady trip for “another decade”.ple different undertakings.

After declaring the commencement of Project Azm, the then Chief of Air Staff (CAS) Air Chief Marshal (ACM) Sohail Aman had educated that the structure period of the Male Unmanned Aerial Vehicle (UAV) has arrived at its “last stages”.

Follow us on facebook OnTrendingpk

Leave a Reply

Your email address will not be published. Required fields are marked *

Pin It on Pinterest